Facilities shift handover checklist
Pass open tenant requests to the next shift with the exact location, current owner and next check. The Excel workbook includes a blank log and a worked example for a commercial building.
Share link
Before the outgoing shift leaves
- Use one ticket ID for the request. Record when it came in, in site-local time, and identify the building, floor and room.
- Summarise what the tenant reported and record any checks or actions already completed.
- Identify the person or team responsible. Add the current status, the next action and a due time or check-in time.
- Review open items with the incoming shift and confirm who will follow up.
For emergencies, follow the building’s established contacts and procedures.
Example handover entry
This example uses a fictional building and request. Times are local to the site.
- Ticket and time
- DEMO-012 · 5 October 2026, 20:35
- Location
- Building A, fifth floor, shared meeting room
- Issue
- A tenant reported weak cooling.
- Owner and status
- Morning facilities technician · In progress
- Next check
- 6 October, 07:30 · Inspect the filter and check airflow.
See the same request move between shifts
The 27-second walkthrough shows how AI collects the details, a supervisor assigns the request and the next shift reads the same record. The walkthrough has a Korean interface and English captions.